Section II. MOVEMENT TO A NEW WORKSITE.
4-4.
Dismantling for Movement
a. Preparation for Movement.
(1)
Stop the generator set, figure 2-8.
(2)
Close the three-way fuel valve, figure 2-
3(E).
(3)
Disconnect the load lines and ground lead.
(4)
Remove the exhaust pipe extension, if
used.
(5)
Disconnect the auxiliary fuel hose, if used.
(6)
Remove all anchoring devices.
b. Handling the Generator Set.
CAUTION
Tubular frame is not to be used for
lifting or towing.
(1)
If the generator set is to be moved only a
short distance, it may be carried or towed to the new
worksite.
(2)
In movement from the immediate area or
over rough terrain, use a hand truck or forklift to move
the generator set to the new worksite.
4-5.
Reinstallation After Movement
Refer to paragraph 4-2 for reinstallation instructions
after movement to a new worksite.