c. Inspection. Inspect the fuses, lamps, and the
following control box components for breaks, wear,
corrosion, and other defects.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
Incandescent lamps (fig. 3-3).
Panel light assembly (fig. 2-3).
Time totalizing meter (fig. 2-3).
Battery charging ammeter (fig. 2-3).
Oil pressure indicator (fig. 2-3).
Toggle switch (fig. 2-3).
Voltage selector switch (fig. 2-3).
Voltage adjusting resistor (fig. 2-3).
Ammeter phase selector switch (fig. 2-3).
AC voltmeter (fig. 2-3).
AC current meter (fig. 2-3).
Frequency indicator (fig. 2-6).
Fuse holder (fig. 3-2).
Circuit breaker (fig. 2-3).
Voltage regulator (fig. 5-2).
Relay panel assembly (fig. 5-1).
Armature relay (fig. 4-32).
Current transformer (fig. 5-1).
Remote control board assembly (fig. 2-9).
Load terminal (fig. 4-35).
Load terminal board assembly (fig. 4-35).
Outlet receptacle (fig. 4-29).
Radio interference suppression capacitor
(fig. 4-20).
(24) Lower and upper vibration mount (fig. 4-
30).
TM 5-6115-332-14
P-8-614-14
TO 35C2-3-424-1
(25) Control box bracket (fig. 4-32).
(26) Control panel assembly (fig. 2-3).
d. Installation.
(1) Install the lamps, refer to figure 3-3.
(2) Install the fuses, refer to figure 3-2.
(3) Lock the fasteners on the control box, refer
to figure 2-3.
3-15. Generator Assembly
a. Inspection.
(1) Inspect the generator for cracks, breaks,
and other damage.
(2) Inspect the air intake grille (fig. 6-3) for
breaks, tears and wear.
b. Service.
(1) Perform the operators preventive mainte-
nance checks and services, Tables 3-2 and 3-3.
(2) Remove all tape and tags, cloth, and other
barrier material.
(3) Correct all deficiencies that are found or
report the condition to organizational maintenance.
3-16. Frame Assembly
a. Inspect the frame guard, lifting bracket,
grounding stud, skid base assembly, toolbox and
plates for wear, cracks, breaks and other damage.
b. If replacement is required, report to or-
ganizational maintenance.
3-15