TM 5-6115-596-14
5-18.
Removal .
a.
(1) Make certain all power is turned OFF.
(2) Remove three nuts (14) and washers (15), and disconnect
circuit 1 lead (13), circuit 2 lead (2), and circuit 478 lead (3)
at generator.
(3)
Remove nut (10) and three washers (12) and disconnect two
circuit 50 leads (11) and ground lead (4) at generator.
(4)
Remove screw (17) and two washers (1) securing drive belt
(5)
brace (16) to generator.
(6)
Remove two screws (8) and four washers (7) and remove
Adjusting generator voltage.
Figure 5-4.
Change 2
5-19