TM 5-6115-434-12
a.
Time Totalizing Meter (two used system No. 1 and No. 2)
(1)
Removal. Tag and disconnect electrical connections to time totalizing meter. Remove meter from panel.
(2)
Cleaning and inspection.
(a)
Clean meter with filtered compressed air or wipe with a clean rag moistened with an approved
cleaning solvent.
(b)
Visually inspect meter for corrosion, cracks, damaged threads or other evidence of damage.
(3)
Installation. Install in reverse order of removal procedures.
b.
Panel Lamp Assembly.
(1)
Removal. Tag and disconnect electrical connections to lamp assembly. Remove nut and washer from
lamp assembly. Remove lamp assembly from panel.
(2)
Cleaning and inspection.
(a)
Clean lamp assembly with filtered compressed air and electricians brush or wipe with a clean rag
moistened with an approved cleaning solvent.
(b)
Visually inspect lamp assembly for corrosion, cracks, damaged threads or other evidence of
damage.
(3)
Installation. Install in reverse order of removal procedures.
c.
Compressor Motor Circuit Breaker. (two used, system No. 1 and No. 2)
(1)
Removal. Tag and disconnect electrical connections to circuit breaker. Remove bar from circuit breaker
push buttons. Remove six screws and six washers from circuit breaker. Remove circuit breaker from panel.
(2)
Cleaning and inspection.
(a)
Clean circuit breaker with filtered compressed air or wipe with a clean rag moistened with an
approved cleaning solvent.
(b)
Visually inspect circuit breaker for corrosion, cracks, damaged threads or other evidence of damage.
(3)
Installation. Install in reverse order of removal procedures.
d.
Recirculating Fans and Condenser Fans Circuit Breakers (two of each used, system No. 1 and No. 2)
(1)
Removal. Tag and disconnect electrical connections to circuit breaker. Remove four screws and four
washers from circuit breaker. Remove circuit breaker from panel.
(2)
Cleaning and inspection.
(a)
Clean circuit breaker with filtered compressed air or wipe with a clean rag moistened with an
approved cleaning solvent.
(b)
Visually inspect circuit breaker for corrosion, cracks, damaged threads or other evidence of damage.
(3)
Installation. Install in reverse order of removal procedures.
e.
Time Totalizing Meter Circuit Breaker (two used, system No. I1 and No. 2)
(1)
Removal. Tag and disconnect electrical connections to circuit breaker. Remove nut and washer attaching
circuit breaker to panel. Remove circuit breaker from panel.
(2)
Cleaning and inspection.
(a)
Clean circuit breaker with filtered compressed air or wipe with a clean rag moistened with an
approved cleaning solvent.
(b)
Visually inspect circuit breaker for corrosion, cracks, damaged threads or other evidence of damage.
(3)
Installation. Install in reverse order of removal procedures.
3-57. Environment Control Panel Assembly (fig. 3-17)
Warning
Electrical power shall be shut off prior to maintenance on electrical components.
Note
Access to the environment control panel is obtained by removing twenty bolts and twenty washers
from the perimeter of the environment control panel cover.
a.
Thermal Relay (three used).
(1)
Removal. Remove cover from electrical connections on thermal relay. Tag and disconnect electrical
connections and bus bars to thermal relay. Remove two screws and four washers from thermal relay. Remove thermal
relay from panel.
(2)
Cleaning and inspection.
(a)
Clean thermal relay with filtered compressed air or wipe with a clean rag moistened with an approved
cleaning solvent.
3-64