TM 5-6115-332-14
P-8-614-14
TO 35C2-3-424-1
Section III.
GENERAL MAINTENANCE
5-5. General
Refer to Chapters 2 and 3 for operator preventive
maintenance checks and services and service the
generator set.
5-6. General Disassembly Procedures
a. Components to be repaired shall be dis-
assembled to the extent required for complete ser-
viceability.
b. Serviceable, precision, matched or mated
parts shall be marked, handled and stored to pre-
clude damage and to insure reassembly and instal-
lation in their matched and mated positions in the
same assembly or component.
5-7. General Repair and/or Replace-
ment Criteria
a. In-process inspection shall be performed on
each assembly, subassembly and component parts
being repaired to insure strict adherence to criteria
established by this manual.
b. Welding shall assure complete fusion and
penetration and be in compliance with specifica-
tions and standards referenced herein.
5-8. General Reassembly Procedures
a. General precautions shall be adhered to dur-
ing reassembly to insure that all internal parts
have been properly installed and necessary lerance
checks performed.
b. upon completion of reassembly, generator set
shall be lubricated in accordance with Lubrication
Order. Refer to DA-PAM-310-4 for current listing.
5-8