TM 5-6115-271-14
TO 35C2-3-386-1
TM-05926A-14
NAVFAC P-8-613-14
(11) Rebuild. Consists of those services/actions
C-3. Explanation of Columns in Section III
ment to a like new condition in accordance with
a. Column (1), Reference Code. This column con-
sists of an arabic number listed in sequence from
original manufacturing standards. Rebuild is the
highest degree of material maintenance applied to
column 5 of Section II. The number references the
Army equipment. The rebuild operation includes the
common tool sets, special tools and test equipment
requirements.
act of returning to zero those age measurements
(hours/miles, etc.) considered in classifying Army
b. Column (2), Maintenance Category. This column
equipments/components.
shows the lowest category of maintenance authorized
d. Column (4), Maintenance Category. This column
to use the special tools or test equipment.
is made up of subcolumns for each category of
c. Column (3), Nomenclature. This column lists the
maintenance. Work time figures are listed in these
name or identification of the common tool sets, special
sub-columns for the lowest level of maintenance
authorized to perform the function listed in column 3.
tools or test equipment.
These figures indicate the average active time
required to perform the maintenance function at the
d. Column (4), Nationa/NATO Stock No. (NSN).
This column is provided for the NSN of common tool
indicated category of maintenance under typical field
sets, special tools and test equipment listed in the
operating conditions.
nomenclature column.
e. Column (5), Tools and Equipment. This column
e. Column (5), Tool Number. This column lists the
is provided for referencing by code, the common tool
manufacturer's code and part number of tools and
sets (not individual tools), special tools, test and sup-
port equipment required to perform the designated
test equipment.
function. Refer to Section III.
(4)
(5)
(1)
(2)
(3)
Maintenance Category
Group
Component/Assembly
Maintenance
Tools and
O
F
C
H
D
Number
Function
Equipment
**
01
FRAME ASSEMBLY
Frame, Upper . . . . . . . . . . . . . . . .
Inspect
0.1
0.5
Replace
1.0
1
Repair
Shock Mounts . . . . . . . . . .
0.1
Inspect
1.0
Replace
Ground Stud and Strap . . . . . . . . . .
0.1
Inspect
0.2
Replace
02
CONTROL BOX ASSEMBLY
Control Box . . . . . . . . . . . . . . . . . . . .
Inspect
0.1
0.8
1
Replace
0.6
1
Repair
Resistor, Variable . . . . . . . . . . . . . . .
Inspect
0.1
2
Test
0.1
0.2
Replace
Switches . . . . . . . . . . . . . . . . . . . . .
Inspect
0.1
3,2
Test
0.1
0.5
Replace
*Subcolumns are as follows C-Operator/crew; O-Organizational; F-Direct support; H-General support; D-Depot.
**Indicates Worktime (Manhours) Required
Change 9
C-2