TM 5-6115-434-12
4-9. Training
All operators should receive thorough training in the destruction of the power unit. Refer to FM 5-25. Simulated
destruction, using all the methods listed above should be included in the operator training program. It must be
emphasized in training that demolition operations are usually necessitated by critical situations when time available for
carrying out destruction is limited. For this reason, it is necessary that all operators be thoroughly familiar with all
methods of destruction of equipment and be able to carry out demolition instructions without reference to this or any
other manual.
Figure 4-1. Placement of charges (Sheet 1 of 2).
4-3