Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1 INTRODUCTION - TM-5-6115-434-12_40
Pneumatic and shaft power gas turbine engine
Engine electrical system
Conditioned Air System
Water System
Identification and Tabulated Data - TM-5-6115-434-12_62
Tabulated data.
Recommended Fuels
Conditioned air system.
Water system.
Difference in Models
CHAPTER 2 INSTALLATION AND OPERATING INSTRUCTIONS
Remove battery vent caps
Table 2-1. Hydrometer Specific Gravity Temperature Corrections
Installation or Setting Up Instructions
Water system connections and priming
Standby operation connections
Section II. MOVEMENT TO A NEW WORKSITE
Stowage of Accessory Components
Final Procedures.
Section III. CONTROLS AND INSTRUMENTS
Water System Controls
Panel Illumination Lamps
Auxiliary Power Trip Indicator Lamp
Panel Illumination Lamp
Cooled Air System Indicating Lamp
400 Hz Electrical System Controls and Instruments
Electrical Output Connection Panel Controls
Starting
Operation to Deliver Cooled Air.
Operation in Extreme Heat
Section VI. OPERATION OF AUXILIARY MATERIAL USED IN CONJUNCTION WITH THE EQUIPMENT
CHAPTER 3 OPERATOR AND ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section III. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Table 3-2. Preventive Maintenance Checks and Services
Preventive Maintenance Checks and Services-Continued
Table 3-3. Troubleshooting
Troubleshooting-Continued - TM-5-6115-434-12_137
Troubleshooting-Continued - TM-5-6115-434-12_138
Troubleshooting-Continued - TM-5-6115-434-12_139
Troubleshooting-Continued - TM-5-6115-434-12_140
Troubleshooting-Continued - TM-5-6115-434-12_141
Troubleshooting-Continued - TM-5-6115-434-12_142
Troubleshooting-Continued - TM-5-6115-434-12_143
Troubleshooting-Continued - TM-5-6115-434-12_144
Troubleshooting-Continued - TM-5-6115-434-12_145
Table 3-4. Temperature Conversion Chart
Temperature Conversion Chart-Continued
Using Gas Turbine Engine Analyzer During Troubleshooting
Engine acceleration rate
Table 3-5. Sequence of events during performance check
Sequence of events during performance check-Continued - TM-5-6115-434-12_154
Sequence of events during performance check-Continued - TM-5-6115-434-12_155
Sequence of events during performance check-Continued - TM-5-6115-434-12_156
Sequence of events during performance check-Continued - TM-5-6115-434-12_157
Sequence of events during performance check-Continued - TM-5-6115-434-12_158
Load control thermostat.
Fuel control assembly governor speed setting.
Section V. FIELD EXPEDIENT REPAIRS
Section VI. RADIO INTERFERENCE SUPPRESSION
External Fuel System Filter Elements
Fuel Control Unit
Test
Section VIII. LUBRICATION SYSTEM
Pressure Relief Valve
Oil Pump Assembly
Cooling Fan Assembly
Section IX. ENGINE ELECTRICAL SYSTEM
Engine Electrical Starter
Ignition Unit
Time Totalizing Meter - TM-5-6115-434-12_184
Instrument Panel Assembly
Conditioned Air System Circuit Breaker Panel
Environment Control Panel Assembly
Temperature Control Panel Assembly
Section XI. 400 HZ AND 60 HZ ELECTRICAL SYSTEMS
Upper Rack Assembly
Relay
Lower Rack Assembly
Receptacle Panel Assembly
60 HZ Convenience Receptacle Circuit Breaker
Standby Operation Control Connector Plug.
400 Hz Generator
Section XII. COOLED AIR SYSTEM
Section XIII. HEATED AIR SYSTEM
Bleed-Air Load-Control Valve.
Section XIV. WATER SYSTEM
Section XV. COMPRESSED AIR AND VACUUM SYSTEM
CHAPTER 4 SHIPMENT AND LIMITED STORAGE AND DEMOLITION TO PREVENT ENEMY USE
Section II. DEMOLITION OF MATERIAL TO PREVENT ENEMY USE
Training
APPENDIX A REFERENCES - TM-5-6115-434-12_230
APPENDIX B BASIC ISSUE ITEMS LIST
Explanation of Columns - TM-5-6115-434-12_232
Section II. BASIC ISSUE ITEMS LIST
Description - TM-5-6115-434-12_234
Section III. MAINTENANCE AND OPERATING SUPPLIES
APPENDIX C MAINTENANCE ALLOCATION CHART - TM-5-6115-434-12_236
Explanation of Columns - TM-5-6115-434-12_237
Section III. SPECIAL TOOL AND SPECIAL TEST EQUIPMENT REQUIREMENTS
Nomenclature - TM-5-6115-434-12_246
Nomenclature - TM-5-6115-434-12_247
Section IV. REMARKS