CHAPTER 1 INTRODUCTION - TM-5-6115-275-14_32Section II. DESCRIPTION AND TABULATED DATA Generator.Identification and Tabulated Data - TM-5-6115-275-14_38Dimensions and WeightTable 1-1. Bolt Capscrew and Nut Torque Wrench Specifications Serial Numbers. Generator - TM-5-6115-275-14_45Generator Repair and Overhaul Data - TM-5-6115-275-14_46Generator Repair and Overhaul Data - TM-5-6115-275-14_48Voltage Performance.Voltage Regulation Specifications Differences Between Models - TM-5-6115-275-14_51CHAPTER 2 OPERATING INSTRUCTIONS - TM-5-6115-275-14_52StoppingSection II. OPERATION OF AUXILIARY EQUIPMENTSection III. OPERATION UNDER UNUSUAL CONDITIONSOperation In Dusty Or Sandy Areas - TM-5-6115-275-14_69Operation In Salt Water Areas - TM-5-6115-275-14_70CHAPTER 3 OPERATOR/CREW MAINTENANCE INSTRUCTIONS - TM-5-6115-275-14_71Section II. LUBRICATION INSTRUCTIONS Table 3-2. Operator/Crew Preventive Maintenance Checks and Services - TM-5-6115-275-14_73Operator/Crew Preventive Maintenance Checks and Services -contSection IV. TROUBLESHOOTINGTable 3-4. Operational Troubleshooting Operational Troubleshooting (Contd) - TM-5-6115-275-14_77Operational Troubleshooting (Contd) - TM-5-6115-275-14_78Operational Troubleshooting (Contd) - TM-5-6115-275-14_79Operational Troubleshooting (Contd) - TM-5-6115-275-14_80Operational Troubleshooting (Contd) - TM-5-6115-275-14_81Operational Troubleshooting (Contd) - TM-5-6115-275-14_82Section V. OPERATOR/CREW MAINTENANCE INSTRUCTIONSSection VIII. BATTERY AND CABLESOptional Battery Installation. Section X. GENERATOR ASSEMBLY.CHAPTER 4 ORGANIZATIONAL MAINTENANCE INSTRUCTIONS - TM-5-6115-275-14_88Installation - TM-5-6115-275-14_90Setting Up Instructions.Grounding. Auxiliary Fuel Hose ConnectionProcedures for Constructing Revetment.Wall Construction. Roof Construction. Equipment ConversionTable 4-1. Output Selector Switch Knob PositionsSection II. MOVEMENT TO A NEW WORKSITE. Section III. REPAIR PARTS, SPECIAL TOOLS AND EQUIPMENT Section V. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) Section VI. ORGANIZATIONAL TROUBLESHOOTING Using the DC Volts Scale AN/URM-105. Using the AC Volts Scale. Troubleshooting TableTable 4-3. Organizational Troubleshooting Organizational Troubleshooting (Contd) - TM-5-6115-275-14_128Organizational Troubleshooting (Contd) - TM-5-6115-275-14_129Organizational Troubleshooting (Contd) - TM-5-6115-275-14_130Section VII. RADIO INTERFERENCE SUPPRESSIONSection VIII. MAINTENANCE OF ENGINE ASSEMBLY Cleaning, Inspection and Repair - TM-5-6115-275-14_136Section IX. MAINTENANCE OF FUEL SYSTEM Cleaning, Inspection and Repair. - TM-5-6115-275-14_139Cleaning, Inspection and Repair. - TM-5-6115-275-14_141Three-Way Valve and Heater Fuel Valve Fuel Selector Valve Cleaning, Inspection and Repair. - TM-5-6115-275-14_147SECTION X. MAINTENANCE OF THE BATTERY AND CABLES Section XI. MAINTENANCE OF ELECTRICAL PANELS AND CONTROLS Battery Charging AmmeterPanel Light BulbsAmmeter, Voltmeter: Frequency MeterCleaning, Inspection and Repair - TM-5-6115-275-14_157Voltage Regulator - TM-5-6115-275-14_158Repair open circuit and retest generatorRelays and ResistorsTesting - TM-5-6115-275-14_162Remove Control Terminal Board Remote Terminals Drip Cover, Circuit Breaker Drip Cover, And Load Terminals Covererminal BlockFan and Coupling AssemblyCleaning, Inspection and Repair - TM-5-6115-275-14_167Section XIII. MAINTENANCE OF THE FRAME ASSEMBLY Rail Guard, Ground Stud, Tow Bolt Battery Charging Electrical Receptacle Connector and Bracket Air Baffles Cleaning, Inspection and Repair. - TM-5-6115-275-14_174Grounding Stud Terminal Slave Receptacle Fuel Drum Adapter ClipsReplace Lost or Broken Terminal Clip - TM-5-6115-275-14_179CHAPTER 5 INTERMEDIATE (FIELD) (DIRECT SUPPORT AND GENERAL SUPPORT) AND DEPOT MAINTENANCE INSTRUCTIONSTable 5-1. TroubleshootingTroubleshooting (Contd) - TM-5-6115-275-14_182Troubleshooting (Contd) - TM-5-6115-275-14_183Troubleshooting (Contd) - TM-5-6115-275-14_184Troubleshooting (Contd) - TM-5-6115-275-14_185Troubleshooting (Contd) - TM-5-6115-275-14_186Generator and EngineCleaning and Inspection. - TM-5-6115-275-14_193CHAPTER 7 MAINTENANCE OF ENGINE AND ELECTRICAL, PANELS AND CONTROLSTesting of Ammeter Phase Switch Cleaning, Inspection, and Repair. Circuit BreakersVoltage Regulator - TM-5-6115-275-14_202Test Equipment and Material RequiredTest power transistor Q2Test diode Perform tests.Locate R6 on the printed circuit board.Connect a multimeterAdjustment.Transistor replacementCurrent TransformerOutput Terminal BoardCHAPTER 8 MAINTENANCE OF GENERATOR ASSEMBLY AND FRAME ASSEMBLYCleaning, Inspection, and RepairWINDING DATAExciter ArmatureTesting - TM-5-6115-275-14_230Assembly. GENERATOR - TM-5-6115-275-14_232Varnish and Baking Procedure.Section II. FRAME ASSEMBLYCleaning, Inspection, and Repair.SKID BASE Engine Support, Drip Pan, Deflector Plates, and Baffle PlatesSKID BASECHAPTER 9 GENERATOR SET TEST AND INSPECTION AFTER REPAIR OR OVERHAULTable 9-1. Visual and Operational InspectionVisual and Operational Inspection (Contd) APPENDIX A REFERENCES - TM-5-6115-275-14_256REFERENCES -cont - TM-5-6115-275-14_257APPENDIX B BASIC ISSUE ITEMS LIST AND ITEMS TROOP INSTALLED OR AUTHORIZED - TM-5-6115-275-14_258APPENDIX C MAINTENANCE ALLOCATION CHART - TM-5-6115-275-14_259Explanation of Columns - TM-5-6115-275-14_260Section II. MAINTENANCE ALLOCATION CHART .MAINTENANCE ALLOCATION CHART -cont - TM-5-6115-275-14_262MAINTENANCE ALLOCATION CHART -cont - TM-5-6115-275-14_263Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS